Posts

Showing posts from November, 2026

Fill-Level Drift: The Silent Profit Leak in Can Filling Lines

Image
  A filler that was perfect at commissioning rarely stays perfect. Valve seats wear, servo calibration slips, product temperature wanders by two degrees, and your 330 ml cans start leaving at 334 ml. Nobody notices. At 24,000 cans an hour, that 4 ml is 96 litres of syrup an hour walking out the door. Every can filling line drifts. The only audit questions are how fast, and who tells you. The Spec Detail Most Buyers Skip Accuracy at rated speed, not demo speed Ask for ±1 ml at full output. Brochures quote the best figure from the slowest run. When you write the specification for a can filling line , put the rated cans-per-hour and the accuracy tolerance in the same sentence of the contract. The overlooked detail: temperature compensation Product at 4 °C and product at 10 °C foam differently, so fill height changes with no mechanical fault at all. Most buyers fix speed and ignore this. Ask whether the filler compensates for product temperature and dissolved CO₂, and ask to see it d...